Permit checker

Check the reviewed permit path.

Enter the place and project. Public conclusions appear only when reviewed local records are available.

Informational planning only. Confirm details with the official authority. Use city/state or ZIP; do not enter a full street address.

Result

Reviewed permit result found.

Location
Seattle, WA
Project
Battery storage

Seattle

Electrical permit and Seattle Fire permit check for battery storage systems

SDCI's electrical permit page requires an electrical permit when wiring is installed, altered, extended, or connected to electrical equipment. Seattle Fire Department's energy storage information sheet says power walls or solar photovoltaic installations in a one- or two-family residential setting do not require an SFD permit, but directs those installations to SDCI permitting; other battery storage scopes should be checked against Seattle Fire and SDCI requirements before installation.

Official application

Source record

Seattle Department of Construction and Inspections: Electrical Permit
Type
Local Building Department
Tier
A
Verified
2026-05-01