San Diego
Electrical permit and possible building permit check for EV charger installation
City of San Diego DSD's EVCS bulletin says an Electrical Permit is required for EV charging station installation, and a Building Permit is required where new building construction, additions, or alterations to an existing structure are proposed. EVCS in a residential private garage for single-dwelling units, duplexes, or townhouses can use the Simple No Plan permit path when eligible, but historic properties, multifamily, commercial, non-residential, structural, accessibility, utility-load, or other site conditions can require plans or a building permit.
Official applicationSource record
City of San Diego Development Services Department: How to Obtain a Permit for Electric Vehicle Charging Systems- Type
- Local Building Department
- Tier
- A
- Verified
- 2026-05-01